Maryborough Water Quality Enhancements – Mechanical Installation
Project Overview
Client : Veolia Water Services
Date : September 1, 2016
Info : Water Treatment Plant Upgrade
Description of Works
SALT REDUCTION BUILDING – INTERNAL AREA
SRU RO units installations
Connections into RO Blend Stream
Potable Water Supply connections
Air lines supply connections
FRP channel grate covers installation
SALT REDUCTION BUILDING – CHEMICAL AREA
Neutralisation Tank Installation
Citric Acid Tank Installation
Anti-Scalant Tank installation
Biocide Storage Tank installation
Potable Water Supply connection
SRU Standby Back-up Generator installation.
FILTER GALLERY
Relocation of existing Clear Water Sump Pump
Filtered treated water pipeline installation
Treated Permeate water return (from SRU) installation
Backwash pump & pipeline installation
Post-dose Chlorine installation
Free Chlorine sample point installation
Pre-SODA ASH dose point installation
Post-dose Ammonia installation