Chapel Street SPS Upgrade

Scope:

  • Demolition and disposal of existing discharge pipework within the pump station well and above ground.
  • Removal of internal building components;
    Toilet,
    Shower,
    Hand basin,
    Lifting gantry etc.
  • Fabrication and installation of stainless steel 316 DN200 discharge pipework.
  • Installation of;
    DN200, DN250 Isolation Gate Valves
    DN200 Non Return Valves
    DN80 Isolation Gate Valve
    DN200 Flowmeter
    DN80 Air Valve
  • Installation of 2 x  Grundfos Submersible Wastewater Pumps - S1.100.200.850.4.70H.C.432.G.N.D (Duty Point 79 L/s @ 54m H).
  • Supply and installation of Monorail, lifting device and rate trolley